Imaginary- Installation Casualties

Imaginary was installed at the Coaster Station in the City of Solana Beach for almost a year.  Each plarn doily was installed by attaching the pieces using a small gauge wire onto the fence.  The process took awhile since I ensured it was not too taut and it kept its circular form.  Sadly, as my husband and I took each doilies down, I realized my favorite pieces are missing.  Pictured above on the left is the brown, yellow, and white plarn doily and on top right is a small orange, brown, grey, and white doily.  These two pieces were taken during the duration of the installation.  It is still pretty upsetting but most have consoled me stating that I should take it as a form of flattery....either way, it taught me to keep installations whole and intact.

Imaginary (detail)

Imaginary (detail)